Intermatic – Intermatic Motor Long Leads Old Style 220V

Sale!

Intermatic – Intermatic Motor Long Leads Old Style 220V

Original price was: $47.99.Current price is: $14.39.

SKU: ne9amz766 Category:

Description

Intermatic Motor Long Leads Old Style 220V – WG433-20D

Voltage: 240V
Manufacturer: Intermatic
Product Type: Automatic Control
Warranty: 1-Year

Reviews

There are no reviews yet.

Be the first to review “Intermatic – Intermatic Motor Long Leads Old Style 220V”

Your email address will not be published. Required fields are marked *